AMCC 3WARE 9590SE Guida di Installazione Pagina 26

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 36
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 25
Chapter 2. Installing the Battery Backup Unit
22 3ware 9590SE Serial ATA RAID Controller Quick Install Guide
Tools and equipment required
Slot-head screwdriver
Grounding strap
Battery Backup Unit (BBU) and battery
3ware 9590SE series controller
Installation Overview
The Battery Backup Unit (BBU) is comprised of two pieces: the
battery module and the BBU control module.
These pieces attach to the controller at the points illustrated in
Figure 13 and 14:
a Clips on the battery module match to two slots on the top and
one hole in the middle of the 3ware 9590SE RAID controller.
b Connector on the BBU mates to receptacle on the controller.
c Post on the BBU mates to post hole on the controller.
Figure 13. Points of connection on the BBU
a) Clips
b) BBU connector
c) Post
Vedere la pagina 25
1 2 ... 21 22 23 24 25 26 27 28 29 30 31 ... 35 36

Commenti su questo manuale

Nessun commento